Step 1:
Spread tile adhesive on floor and/or walls/or back of tiles. Place Clip approximately 100-lSOmm from the tile corner. For an even better finish, additional clips can be placed in the middle of the tile or where the four tiles meet.

Step 2:
After the clips have been placed you can then drive the wedge home through the openings using your thumb/finger. For that extra drive you can use your palm.

Step 3:
Once the tile adhesive is set the clip system is ready to be removed and ready for grouting. By kicking with the foot or a rubber mallet, hit the clip on the side and always in the same direction of the grout lines.